Sewerage Water Treatment Plant (STP) - 1 Month Internship Training Program
Join 1 Month Sewerage Water Treatment Plant (STP) Internship Training Program at NextVision Infotech. Learn sewage characteristics, primary, secondary, tertiary treatment, sludge management. ₹399 only with certificate.
Program Description
Skills You'll Learn
Projects You'll Work On
Complete Sewerage Water Treatment Plant (STP) Project (1 Month)
Students will complete an STP design project including sewage characterization, treatment train design, preliminary, primary, secondary, tertiary treatment design, sludge management, process flow diagrams, and complete project documentation as per industry standards.
Program Modules
W1: Week 1: Sewage Fundamentals and Characteristics
Introduction to sewage, sewage sources - domestic, industrial, commercial, stormwater, sewage characteristics - physical, chemical, biological, physical characteristics - color, odor, temperature, solids, chemical characteristics - pH, alkalinity, BOD, COD, TOC, nitrogen, phosphorus, heavy metals, oil and grease, biological characteristics - bacteria, viruses, protozoa, helminths, pathogens, indicator organisms, sewage flow rates, flow variations, peak flow, design flow, sewage quantity estimation, sewage quality standards, effluent standards - CPCB, SPCB, BIS, STP objectives, treatment train, unit operations and processes.
W2: Week 2: Preliminary and Primary Treatment
Preliminary treatment - screening, coarse screening, fine screening, bar screens, rotary screens, comminutors, macerators, grit removal, grit chambers - horizontal flow, vertical flow, aerated grit chamber, vortex grit chamber, oil and grease removal, skimming tanks, primary treatment - primary sedimentation, sedimentation tanks - rectangular, circular, clarifiers, settling theory, types of settling - discrete, flocculent, hindered, compression, sedimentation tank design, surface loading rate, detention time, weir loading rate, sludge removal mechanisms, chemical precipitation, coagulation, flocculation, primary sludge characteristics.
W3: Week 3: Secondary Treatment
Secondary treatment objectives, biological treatment fundamentals, microbial growth kinetics, activated sludge process (ASP), ASP components, aeration tank, secondary clarifier, return activated sludge (RAS), waste activated sludge (WAS), aeration systems - diffused aeration, mechanical aeration, ASP modifications - conventional, step aeration, tapered aeration, contact stabilization, extended aeration, oxidation ditch, sequencing batch reactor (SBR), moving bed biofilm reactor (MBBR), membrane bioreactor (MBR), trickling filters, rotating biological contactors (RBC), stabilization ponds - aerobic, anaerobic, facultative, aerated lagoons, upflow anaerobic sludge blanket (UASB), design parameters - F/M ratio, MLSS, MLVSS, SRT, HRT, DO, sludge volume index (SVI).
W4: Week 4: Tertiary Treatment, Sludge Management, Live Projects, and Certification
Tertiary treatment objectives, nutrient removal - nitrogen removal, nitrification, denitrification, phosphorus removal, chemical precipitation, biological phosphorus removal, enhanced biological phosphorus removal (EBPR), disinfection - chlorination, UV disinfection, ozonation, membrane filtration - microfiltration, ultrafiltration, nanofiltration, reverse osmosis, advanced oxidation processes (AOPs), adsorption - activated carbon, treated water quality, effluent polishing, reuse applications - irrigation, industrial, groundwater recharge, sludge characteristics, primary sludge, secondary sludge, mixed sludge, sludge thickening - gravity thickening, dissolved air flotation, centrifugation, sludge stabilization - anaerobic digestion, aerobic digestion, composting, lime stabilization, sludge dewatering - vacuum filtration, pressure filtration, belt filter press, centrifuge, sludge drying beds, sludge disposal - landfilling, land application, incineration, sludge reuse - biogas generation, biosolids, live projects - STP design, process flow diagram, complete documentation, viva-voce examination, certificate distribution.
Key Features
What You'll Learn
Examination Details
| Exam Name | Full Marks | Pass Marks |
|---|---|---|
| Module-wise Assessment | 100 | 40 |
| Project Evaluation | 100 | 50 |
| Final Presentation | 50 | 25 |
| Viva-Voce | 50 | 25 |
Internship Details
Prerequisites
- Pursuing or completed B.Tech/B.E./Diploma in Civil or Environmental Engineering
- Basic knowledge of environmental science
- Basic knowledge of chemistry
- Interest in sewage treatment and environmental engineering
Who Can Enroll ?
- B.Tech Civil Engineering students (1st to 8th semester)
- B.Tech Environmental Engineering students
- Diploma Civil Engineering students (1st to 6th semester)
- Polytechnic students
- Civil engineering freshers
- Working professionals wanting to upskill
- Students from all over India seeking practical training
Certificate Preview
Related Internships
You might also be interested in these
Our Students Did It! 🎉 Certified & Proud
A big congratulations to our students who recently completed their courses and earned their certificates. Here's what they have to say! 🎓
Our Certificate Samples
Internship Certificate
Tap to view
Joining Letter
Tap to view
Student ID Card
Tap to view
Student Panel
Tap to view
All certificates are issued by NextVision Infotech & are verifiable upon request.
Ready to Start Your Journey?
Take the first step towards your dream career with our internship programs